§ 21-163. Permits.
(a)
Permits required by applicable codes. In addition to the right-of-way work permit in division 3, the network provider must obtain all other permits required by applicable codes and pay the fees established in section 2-595 of this Code.
(b)
Consolidated permits. The network provider may file a consolidated application for the installation or collocation of not more than 30 network nodes and receive a single permit for a permit required by this article or an applicable code. As examples, a network provider may receive one right-of-way work permit for the installation or collocation of not more than 30 network nodes and, if an electrical permit is required, also, a network provider may receive one electrical permit for the installation or collocation of not more than 30 network nodes.
(c)
Issuance of permits. The permit(s) will be issued if the application complies with the provisions of V.T.C.A., Local Government Code ch. 284, this article, applicable codes, and the design manual.
( Ord. No. 13,558 , § 3, 8-24-17)